Whole Project Estimate
Direct cost, preliminaries, overhead, contingency and target margin.
Free Construction Costing Toolkit
For contractors, developers, homeowners, estimators and QS teams who need a fast working estimate before a detailed BOQ, procurement decision or customer quotation.
Use current measurements and supplier rates. This toolkit supports estimating but does not replace a professional quantity survey, BOQ or contract document where one is required.
Practical estimating modules
Direct cost, preliminaries, overhead, contingency and target margin.
Volume, waste allowance, cost per cubic metre, pumping and placing.
Wall area, openings, blocks, waste, mortar and labour.
Surface area, faces/coats, materials and labour.
Area, cuts/waste, flooring, accessories and installation.
Roof area, laps/waste, covering, framing, accessories, gutters and labour.
Paintable area, coats, coverage, litres, consumables and labour.
Trade, crew, days and daily rates.
Hire, fuel, operator and equipment usage.
Mobilisation, site office, HSE, security, utilities and supervision.
Convert the approved estimate into a customer-facing PDF quotation.
Astute Construction & Building Cost Toolkit
Estimate materials, labour, equipment, preliminaries, overhead, contingency and contractor margin. Save projects on this device and turn the final estimate into a customer quotation.
Whole-project costing
Use this for a quick estimate or detailed contractor costing. Add as many cost lines as you need.
Concrete volume & costing
Useful for slabs, beams, columns, footings and simple concrete elements.
Blockwork
Plaster / render
Flooring / tiling
Roofing
Painting
Labour costing
Plant & equipment
Preliminaries & site costs
Construction quotation
Internal cost, overhead and profit calculations are hidden unless you deliberately include them as customer line items.
Project details
Saved projects
What the toolkit is for
A contractor may need a quick job price before preparing a formal BOQ. A developer may want to compare early project scenarios. A homeowner may want to understand why a quoted price is changing. The toolkit is designed for those working calculations.
Where the project requires measured quantities, contract administration, certification, valuation or formal BOQ preparation, use the appropriate professional QS or engineering process.