Skip to main content

Free Construction Costing Toolkit

Estimate Building Cost Before You Commit to the Price.

For contractors, developers, homeowners, estimators and QS teams who need a fast working estimate before a detailed BOQ, procurement decision or customer quotation.

Use current measurements and supplier rates. This toolkit supports estimating but does not replace a professional quantity survey, BOQ or contract document where one is required.

ContractorsPrice jobs before submitting a quotation.
DevelopersBuild early project-cost scenarios.
HomeownersUnderstand the components behind a building estimate.
QS / Estimating TeamsUse as a quick working calculator before detailed measurement.

Practical estimating modules

One Workspace for the Cost Items That Drive Building Prices.

Whole Project Estimate

Direct cost, preliminaries, overhead, contingency and target margin.

Concrete

Volume, waste allowance, cost per cubic metre, pumping and placing.

Blockwork

Wall area, openings, blocks, waste, mortar and labour.

Plaster / Render

Surface area, faces/coats, materials and labour.

Flooring / Tiling

Area, cuts/waste, flooring, accessories and installation.

Roofing

Roof area, laps/waste, covering, framing, accessories, gutters and labour.

Painting

Paintable area, coats, coverage, litres, consumables and labour.

Labour

Trade, crew, days and daily rates.

Plant & Equipment

Hire, fuel, operator and equipment usage.

Preliminaries

Mobilisation, site office, HSE, security, utilities and supervision.

Construction Quotation

Convert the approved estimate into a customer-facing PDF quotation.

Astute Construction & Building Cost Toolkit

Build the Cost Before You Build the Project.

Estimate materials, labour, equipment, preliminaries, overhead, contingency and contractor margin. Save projects on this device and turn the final estimate into a customer quotation.

Current project

Untitled Construction Project

Set the project details once and reuse them across the calculators.

Whole-project costing

Build the full project estimate line by line.

Use this for a quick estimate or detailed contractor costing. Add as many cost lines as you need.

Cost lines

Materials, labour, subcontractors, transport, plant and any other direct cost.

Concrete volume & costing

Estimate concrete quantity, waste allowance and total cost.

Useful for slabs, beams, columns, footings and simple concrete elements.

Blockwork

Estimate wall area, blocks, mortar allowance and cost.

Plaster / render

Estimate plastering area and cost.

Flooring / tiling

Estimate quantity, waste and installation cost.

Roofing

Estimate roof covering, framing, accessories and labour.

Painting

Estimate paint quantity, coats and labour.

Labour costing

Build labour cost by trade, crew or activity.

Labour lines

Example: mason, carpenter, steel fixer, electrician, plumber, painter.

Plant & equipment

Cost hired or owned equipment used on the project.

Equipment lines

Include rental, fuel, operator, mobilisation and standby where relevant.

Preliminaries & site costs

Capture the project costs that are easy to forget.

Construction quotation

Turn the approved estimate into a customer-facing quotation.

Internal cost, overhead and profit calculations are hidden unless you deliberately include them as customer line items.

Your business

Customer / project

Customer charge lines

Use clear descriptions the customer can understand.

What the toolkit is for

A Fast Working Estimate Before the Detailed Commercial Document.

A contractor may need a quick job price before preparing a formal BOQ. A developer may want to compare early project scenarios. A homeowner may want to understand why a quoted price is changing. The toolkit is designed for those working calculations.

Where the project requires measured quantities, contract administration, certification, valuation or formal BOQ preparation, use the appropriate professional QS or engineering process.